Transfer switch bypass time delay, alarm reset and silence pushbutton
Micro-processor based logic control
Mechanically protected and shielded
The transfer switch assembly includes:
One Test push button to simulate a normal power failure. Pressing the Test push button for more than 3 seconds will initiate the transfer to 2nd utility power source. The retransfer to the normal power source is initiated automatically after 5 minutes.
Time delays: To override momentary normal power outages before transfer to 2nd utility. Factory set at 3 seconds. To retransfer to normal power. Instantaneous retransfer in case of alternate (emergency) power failure. (Factory set at 5 minutes.) To allow engine generator cool-down after retransfer to normal source (if applicable). Factory set at 5 minutes.
Voltage, frequency and phase reversal sensing: Voltage sensing on all phases of normal power, set at 85%. A voltage below this value or phase reversal initiates transfer to 2nd utility. 2nd utility voltage and frequency sensing set at 90%. A voltage or frequency above this value initiates transfer to 2nd utility power. Voltage sensing on all phases of normal power, set at 90%. A voltage above this value initiates retransfer to normal power.